SECURE is a workflow based system
In SECURE, the work name & work codes are received from Mahatma Gandhi NREGA MIS to the concerned Estimate Creator login after the approval of Labour budget. The AE/Overseer of the Block/GP creates the detailed estimate with necessary details. As per the Government procedure adopted by the state, the above estimates are accorded AS/TS sanctions and subsequently AS/TS slips are generated from the system. SECURE soft generates Detailed Project Report (DPR) which includes AS/TS No, AS/TS date, total estimate amount, total material Cost & list of materials used in the estimate with quantity, total semi skilled, Skilled manpower cost, total unskilled wages, activity carried out in each work, No of man days( Unskilled manpower). For creating an estimate every state is being used their own LMR rates, SOR as per their state specific rule adopted for MGNREGS works.
- According AS/TS sanctions in SECURE
- All details related to AS/TS, activity & material Generation
Services
SECURE is managed by administration module for user creation, office management, and data entry of SoR / LMR, and uploading photographs, news & Government Orders. User ids are created based on the staff details of the GP, Block, District & State. After According AS/TS sanctions in SECURE, all details related to AS/TS, activity & material may be pulled from SECURE to Nregasoft through web services. This will eliminate re-entering the details like AS/TS No, AS/TS date, total estimate amount, total material Cost, total semi skilled Cost, total Skilled cost, total unskilled wages, Activity carried out in each work, No of man days in Nregasoft. Work allocation and muster roll generation should takes place in the MIS after completing the above processes.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Spill Over
Recalculation of Previous Year Estimate with new unskilled wage rate
Revision of Estimate
Estimate revisions may occur due to changing site conditions, necessitating updates to data/specifications or adjustments in quantities
AS/TS Approval
The system simplifies the process of obtaining AS/TS sanctions, with automatic generation of relevant slips.
State-Specific Adaptability
SECURE is highly adaptable, catering to the unique workflow, rates, and procedures of different states.
State-Specific SoR
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
Enrolled States
HARYANA
First approval: 8970
Final approval: 7132
MANIPUR
First approval: 20178
Final approval: 19472
KARNATAKA
First approval: 184900
Final approval: 176303
HIMACHAL PRADESH
First approval: 26705
Final approval: 24947
SIKKIM
First approval: 4
Final approval: 2
TRIPURA
First approval: 49233
Final approval: 48642
ODISHA
First approval: 182338
Final approval: 146086
ARUNACHAL PRADESH
First approval: 0
Final approval: 0
MADHYA PRADESH
First approval: 296678
Final approval: 289676
NAGALAND
First approval: 3610
Final approval: 3601
JAMMU AND KASHMIR
First approval: 179649
Final approval: 179108
CHHATTISGARH
First approval: 59076
Final approval: 43267
WEST BENGAL
First approval: 0
Final approval: 0
UTTAR PRADESH
First approval: 469893
Final approval: 443449
KERALA
First approval: 174255
Final approval: 171786
ANDAMAN AND NICOBAR
First approval: 0
Final approval: 0
TELANGANA
First approval: 268505
Final approval: 252589
GOA
First approval: 370
Final approval: 369
TAMIL NADU
First approval: 135734
Final approval: 134602
MAHARASHTRA
First approval: 197883
Final approval: 178309
ASSAM
First approval: 25930
Final approval: 13484
GUJARAT
First approval: 42816
Final approval: 33993
ANDHRA PRADESH
First approval: 569942
Final approval: 520860
MIZORAM
First approval: 23365
Final approval: 23365
BIHAR
First approval: 254108
Final approval: 234157
PUDUCHERRY
First approval: 646
Final approval: 620
LADAKH
First approval: 3971
Final approval: 3967
JHARKHAND
First approval: 235855
Final approval: 224449
RAJASTHAN
First approval: 79451
Final approval: 35859
PUNJAB
First approval: 15318
Final approval: 12342
MEGHALAYA
First approval: 17285
Final approval: 16849
UTTARAKHAND
First approval: 33220
Final approval: 31708
Features
SECURE offers advanced features for creating detailed estimates and reports, adapting to state-specific guidelines and rates. The system enhances transparency, accountability, and speed in project approval and monitoring, embodying e-governance principles.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Structural Drawing
Pre-drawn work structural drawing template with customizable measurements for all proposed works.
Estimate accuracy & Time
Rapid estimate creation and approval processes reduce delays significantly & Automatic recalculations for LMR changes ensure continued accuracy.
SOR & rates
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
File Movement
Track estimate status and file movement at any level for complete oversight. And adaptable, catering to the unique workflow, and procedures of different states.
Frequently Asked Questions
- What is DSoR?
The Delhi Schedule of Rates (DSR) is a technical document that is published by the Central Public Works Department (CPWD). It is a list of rates for various items and works in the construction industry. The DSR is a crucial document that plays a significant role in construction projects throughout India.
- What is market rate?
Items which are not available in the DSoR,like to use those items in the estimate for MGNREGA works.
- Works available in SECURE ?
Only approved works are receiving in SECURE from Nregasoft (MIS).
- What is Non Scheduled items/Observed Data?
Data which is not available in CPWD chapters or State SoR
- Pull works is used in which scenario?
For pulling the work from MIS to SECURE