SECURE is a workflow based system
In SECURE, the work name & work codes are received from Mahatma Gandhi NREGA MIS to the concerned Estimate Creator login after the approval of Labour budget. The AE/Overseer of the Block/GP creates the detailed estimate with necessary details. As per the Government procedure adopted by the state, the above estimates are accorded AS/TS sanctions and subsequently AS/TS slips are generated from the system. SECURE soft generates Detailed Project Report (DPR) which includes AS/TS No, AS/TS date, total estimate amount, total material Cost & list of materials used in the estimate with quantity, total semi skilled, Skilled manpower cost, total unskilled wages, activity carried out in each work, No of man days( Unskilled manpower). For creating an estimate every state is being used their own LMR rates, SOR as per their state specific rule adopted for MGNREGS works.
- According AS/TS sanctions in SECURE
- All details related to AS/TS, activity & material Generation
Services
SECURE is managed by administration module for user creation, office management, and data entry of SoR / LMR, and uploading photographs, news & Government Orders. User ids are created based on the staff details of the GP, Block, District & State. After According AS/TS sanctions in SECURE, all details related to AS/TS, activity & material may be pulled from SECURE to Nregasoft through web services. This will eliminate re-entering the details like AS/TS No, AS/TS date, total estimate amount, total material Cost, total semi skilled Cost, total Skilled cost, total unskilled wages, Activity carried out in each work, No of man days in Nregasoft. Work allocation and muster roll generation should takes place in the MIS after completing the above processes.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Spill Over
Recalculation of Previous Year Estimate with new unskilled wage rate
Revision of Estimate
Estimate revisions may occur due to changing site conditions, necessitating updates to data/specifications or adjustments in quantities
AS/TS Approval
The system simplifies the process of obtaining AS/TS sanctions, with automatic generation of relevant slips.
State-Specific Adaptability
SECURE is highly adaptable, catering to the unique workflow, rates, and procedures of different states.
State-Specific SoR
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
Enrolled States
ANDHRA PRADESH
First approval: 569937
Final approval: 520859
GUJARAT
First approval: 42816
Final approval: 33993
MIZORAM
First approval: 23365
Final approval: 23365
BIHAR
First approval: 254108
Final approval: 234149
PUDUCHERRY
First approval: 646
Final approval: 620
LADAKH
First approval: 3971
Final approval: 3967
JHARKHAND
First approval: 235855
Final approval: 224447
RAJASTHAN
First approval: 79447
Final approval: 35775
PUNJAB
First approval: 15316
Final approval: 12342
MEGHALAYA
First approval: 17280
Final approval: 16849
UTTARAKHAND
First approval: 33205
Final approval: 31684
HARYANA
First approval: 8970
Final approval: 7132
MANIPUR
First approval: 20178
Final approval: 19472
KARNATAKA
First approval: 184886
Final approval: 176294
HIMACHAL PRADESH
First approval: 26704
Final approval: 24947
SIKKIM
First approval: 4
Final approval: 2
TRIPURA
First approval: 49233
Final approval: 48634
ODISHA
First approval: 182306
Final approval: 146042
ARUNACHAL PRADESH
First approval: 0
Final approval: 0
MADHYA PRADESH
First approval: 296676
Final approval: 289674
JAMMU AND KASHMIR
First approval: 179645
Final approval: 179107
UTTAR PRADESH
First approval: 469860
Final approval: 443404
TAMIL NADU
First approval: 135693
Final approval: 134600
MAHARASHTRA
First approval: 197883
Final approval: 178309
ASSAM
First approval: 25911
Final approval: 13484
NAGALAND
First approval: 3610
Final approval: 3601
CHHATTISGARH
First approval: 59059
Final approval: 43262
WEST BENGAL
First approval: 0
Final approval: 0
KERALA
First approval: 174250
Final approval: 171778
ANDAMAN AND NICOBAR
First approval: 0
Final approval: 0
TELANGANA
First approval: 268503
Final approval: 252569
GOA
First approval: 370
Final approval: 369
Features
SECURE offers advanced features for creating detailed estimates and reports, adapting to state-specific guidelines and rates. The system enhances transparency, accountability, and speed in project approval and monitoring, embodying e-governance principles.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Structural Drawing
Pre-drawn work structural drawing template with customizable measurements for all proposed works.
Estimate accuracy & Time
Rapid estimate creation and approval processes reduce delays significantly & Automatic recalculations for LMR changes ensure continued accuracy.
SOR & rates
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
File Movement
Track estimate status and file movement at any level for complete oversight. And adaptable, catering to the unique workflow, and procedures of different states.
Frequently Asked Questions
- What is DSoR?
The Delhi Schedule of Rates (DSR) is a technical document that is published by the Central Public Works Department (CPWD). It is a list of rates for various items and works in the construction industry. The DSR is a crucial document that plays a significant role in construction projects throughout India.
- What is market rate?
Items which are not available in the DSoR,like to use those items in the estimate for MGNREGA works.
- Works available in SECURE ?
Only approved works are receiving in SECURE from Nregasoft (MIS).
- What is Non Scheduled items/Observed Data?
Data which is not available in CPWD chapters or State SoR
- Pull works is used in which scenario?
For pulling the work from MIS to SECURE